Baihetan-Jiangsu
The Baihetan-Jiangsu UHV Project

Winning bid products: bridge arm reactor, filter group reactor

 

Filter group reactorYucheng converter station

 

Operation year: 2022

 

The Baihetan-Jiangsu UHV project was approved and ratified by National Development and Reform Commission (NDRC) in November, with a total investment of about 30 billion RMB, and planned to be completed in 2022. The project starts from Baihetan converter station in Liangshan Prefecture, Sichuan Province, and ends at Yucheng converter station in Suzhou, Jiangsu Province, with a total path length of 2,087 kilometers, passing through 5 provinces, 19 cities and 59 counties, and requiring four major crossings of the Yibin Minjiang River in Sichuan Province, the Yangtze River in Chongqing, the Hanjiang River in Zhongxiang, Hubei Province, and the Yangtze River in Ma'anshan, Anhui Province, and so on, and the end of Yucheng converter station will be the first time that a mixed conventional and flexible DC technology has been applied in the world's DC power transmission field. Cascade technology. Transmission capacity of 8 million kilowatts, after completion of the annual power transmission to the provincial power grid 31.2 billion kilowatt-hours.